

Blog
If your neighborhood is part of the Cape Coral Utility Expansion Project (UEP), understanding your financial responsibilities is the first step. Your out-of-pocket connection costs are different from the City's Utility Expansion Project assessment.
While the assessment pays for the new water, sewer, and irrigation infrastructure installed in your neighborhood, you are responsible for the physical connection to your home. Once you receive your Notice of Availability (NOA) letter, you have exactly 180 days to connect your home to the new utilities. That connection requires hiring a licensed plumber, abandoning your septic system, completing City inspections, and paying the required fees. Understanding the difference helps you budget for the work that must be completed before your deadline.
Contact Aztec Plumbing & Drains for a complete quote on your UEP connection and septic abandonment project today.
One of the biggest sources of confusion is understanding which costs belong to the City and which belong to the homeowner.
The City's Utility Expansion Project assessment covers the construction of water, sewer, and irrigation infrastructure serving your neighborhood. Depending on the UEP phase and the property, those assessment amounts may be financed through the annual property tax bill.
Your out-of-pocket expenses are different. Homeowners are responsible for physically connecting the home to the new utility lines after receiving the NOA. That work includes City permits, meter installation fees, connecting the home's plumbing system to the municipal utilities, and completing the required septic abandonment process.
If you're budgeting for your project, separating the City's assessment from the homeowner's connection work provides a much clearer picture of what you'll pay directly.
Once public sewer service becomes available, homes served by septic systems must complete a full septic abandonment, according to local and Florida Department of Health requirements.
The process begins by pumping the septic tank and preparing it for demolition. After inspection, the tank is collapsed and abandoned using approved methods that meet current regulations before the excavation is backfilled and restored.
Aztec Plumbing & Drains manages the entire process, including coordinating the required pump-out, completing the plumbing connection, and handling the work needed to safely transition your home from a private septic system to the City's sewer system.
Receiving your Notice of Availability starts the clock.
Once the NOA is issued by certified mail, improved properties generally have 180 days to complete the required utility connections. Waiting beyond that deadline can create unnecessary complications, as utility charges may begin even if the physical connection has not been completed. Additional enforcement actions may also apply under City ordinance.
Many homeowners in Northwest Cape, including the North 1 West and North 1 East expansion areas, receive NOAs as each phase of the project is completed. Checking the City's utility expansion project map helps homeowners understand when construction is scheduled to reach their neighborhood and when an NOA may be issued.
Scheduling your project soon after receiving the notice provides time for permitting, inspections, and construction before the deadline arrives.
A UEP connection involves much more than connecting a single pipe.
Aztec Plumbing & Drains manages the complete project from the initial permit application to the final inspection. Our crews handle trenching, water and sewer connections, septic abandonment, coordination with inspectors, and rough grading after the work is complete. We also manage the local permitting process, including submitting the required project affidavits for City approvals.
Because the entire project is coordinated through one contractor, homeowners don't have to schedule multiple companies or manage separate stages of the work.
If you're already planning other plumbing improvements, this is also a convenient time to evaluate items such as water heater lifespan before additional excavation or plumbing work is needed later.
Your NOA deadline does not leave much time for planning once the notice arrives. Scheduling your connection early gives you time to complete permits, inspections, and construction before the required deadline.
If you're preparing for your neighborhood's utility expansion, Aztec Plumbing & Drains will inspect your property, explain the work involved, and provide a detailed quote before construction begins.
Contact Aztec Plumbing & Drains today to schedule your connection and septic abandonment consultation.
The answer depends on your UEP phase and current City requirements. Some areas allow continued irrigation well use, while others have different requirements. Review the current City guidance for your neighborhood.
No. City fees are paid directly to the City of Cape Coral. Your plumbing contractor handles the physical connection work after those requirements have been completed.
The septic tank is pumped, inspected, and abandoned according to Florida Department of Health requirements before the excavation is backfilled as part of the transition to the City's sewer system.